Got it, let's fix that error and get your YYYY-WW axis working properly in ggplot2!

Why You're Getting That Error

The date_trans() function (used implicitly when you call scale_x_date()) only works with actual Date class objects—but your X-axis data is in YYYY-WW string/factor format, not a standardized date. That's why R is throwing the "invalid input" message.

Step-by-Step Solutions

1. Convert YYYY-WW to a Proper Date Object (Recommended)

First, we'll turn your week labels into actual dates (e.g., the first day of each week) so ggplot can recognize it as a continuous time axis. We'll use the lubridate package for this:

library(lubridate)
library(ggplot2)
library(scales)

# Assume your melted data frame is named `melted_df`, and your week column is `week`
# Convert YYYY-WW to a Date (use %G-%V for ISO weeks, %Y-%W for US-style weeks)
melted_df$week_date <- parse_date_time(melted_df$week, orders = "%G-%V")
  • Use %G-%V if your weeks follow ISO standards (Monday-starting weeks)
  • Use %Y-%W if your weeks start on Sundays

2. Plot with Formatted YYYY-WW Ticks

Now use the converted week_date as your X-axis, and format the ticks to display back as YYYY-WW:

ggplot(melted_df, aes(x = week_date, y = value, color = variable)) +
  geom_line() +
  scale_x_date(
    breaks = "1 week",  # Show a tick every week (adjust to "2 weeks" if needed)
    labels = date_format("%G-%V"),  # Match your original week format
    name = "Week (YYYY-WW)"
  ) +
  theme(axis.text.x = element_text(angle = 45, hjust = 1))  # Rotate ticks to avoid overlap

3. Alternative: Use Discrete Ticks (No Date Conversion)

If you prefer to keep your original YYYY-WW strings (no date conversion), convert the week column to an ordered factor to maintain proper chronological order, then set discrete ticks:

# Convert week column to ordered factor (critical for correct plotting order)
melted_df$week <- factor(melted_df$week, levels = unique(melted_df$week))

ggplot(melted_df, aes(x = week, y = value, color = variable)) +
  geom_line(group = variable) +  # Group by your line variable since X is discrete
  scale_x_discrete(
    breaks = melted_df$week[seq(1, nrow(melted_df), by = 2)],  # Show every 2nd week
    name = "Week (YYYY-WW)"
  ) +
  theme(axis.text.x = element_text(angle = 45, hjust = 1))

Note: This method treats the X-axis as discrete categories, not a continuous time axis—best for smaller datasets.

Quick Troubleshooting Tip

If you get NA values when converting to dates, double-check that your YYYY-WW format matches the orders argument in parse_date_time() (e.g., no extra spaces, correct week numbering standard).