I’ve run into this exact scenario a handful of times—adding what seems like a totally redundant constraint can throw CPLEX for a loop, especially when boolean variables like sx, sy, sz are involved. Let’s break down the most likely culprits and how to fix them:
Hidden Redundancy or Symmetry That Clogs the Solver
Even if your new constraint looks like it doesn’t change the feasible region, combining it with existing 40+ constraints might create unintended symmetry or redundant logical checks. For boolean variables, this can lead CPLEX to waste cycles exploring identical solution paths it can’t prune efficiently.- Fix steps: Simplify the new constraint to its most basic form (e.g., split compound logical conditions into separate lines) and test if the solver responds. Enable CPLEX’s log output by adding
logoutput=1;to your OPL settings—this will show you if it’s stuck in preprocessing, branching, or feasibility checking.
- Fix steps: Simplify the new constraint to its most basic form (e.g., split compound logical conditions into separate lines) and test if the solver responds. Enable CPLEX’s log output by adding
Numerical Stability Issues With Boolean Variable Logic
Sometimes "harmless" constraints introduce subtle numerical quirks, especially if you’re mixing boolean operations with integer/real values, or using overly verbose syntax (likesx + sy + sz >= 0which is always true, but CPLEX might interpret it as a non-trivial constraint). These can trip up the solver’s preprocessing or branching logic.- Fix steps: Rewrite the constraint using strict OPL boolean syntax (e.g., use
sx == trueinstead of implicit integer conversions). Try adjusting solver parameters to prioritize feasibility over optimality: addcplex.emphasis.mip=1;to your model to make CPLEX focus on finding any feasible solution first, or loosen the MIP gap tolerance withcplex.mip.tolerances.mipgap=0.1;to see if it returns a result faster.
- Fix steps: Rewrite the constraint using strict OPL boolean syntax (e.g., use
Unnoticed Feasibility Conflict
It’s easy to miss a hidden conflict between your new constraint and existing ones. For example, if your original model already enforcessx == 1through a chain of constraints, a new constraint that implicitly assumessx == 0(even if you don’t see it) will make the model infeasible. CPLEX might spend ages searching for a non-existent feasible solution instead of flagging this immediately.- Fix steps: Use OPL’s built-in feasibility checker: add
execute { cplex.checkFeasibility(); }to your model to let CPLEX explicitly verify if the model is feasible. You can also isolate thesx,sy,szconstraints and manually check for logical contradictions—sometimes mapping boolean conditions to truth tables helps spot the issue.
- Fix steps: Use OPL’s built-in feasibility checker: add
Solver Resource Limits or Timeouts
Adding even a simple constraint can slightly increase the model’s complexity, pushing it over the edge of your default resource limits. If your solver is hitting a memory cap or timeout before it can finish processing, it might fail silently with the "doesn’t answer" message.- Fix steps: Increase the solver’s timeout limit with
cplex.tilim=3600;(gives it 1 hour to run) and check if it completes. You can also disable aggressive preprocessing temporarily withcplex.preprocessing.reduce=0;to see if that bypasses a stuck preprocessing step.
- Fix steps: Increase the solver’s timeout limit with
Start with enabling the log output—it’s the fastest way to narrow down whether the issue is feasibility, solver efficiency, or numerical weirdness. Once you know that, you can target the fix more precisely.