Java枚举实现星期计算:基于儒略日公式的结果偏差修正
基于Java枚举与儒略日公式的星期计算偏差问题
核心代码实现
enum Day { MON, TUE, WED, THU, FRI, SAT, SUN; } public Day dayOfTheWeek() { int D = day, M = month, Y = year, A, B, C, intindex; double E = 0, F = 0, JD = 0, num1, num2; if (M == 1 || M == 2) { Y--; M += 12; } A = Y / 100; B = A / 4; C = 2 - A + B; E = 365.25 * (Y + 4716); F = 30.6001 * (M + 1); JD = (C + D + E + F) - 1524.5; num1 = JD % 7; intindex = (int) num1; num2 = num1 - intindex; if (num2 + 0.1 >= 1) { intindex++; } return Day.values()[intindex]; }
测试结果对比
- 输入日期:
1/1/1972 20/8/1980
- 当前代码实际输出:
1/1/1972 SAT 20/8/1980 TUE
- 期望正确输出:
1/1/1972 SAT 20/8/1980 WED
偏差修正说明
补充说明:目前代码已经可以正常运行,只需将Day枚举的顺序调整为从MON到SUN,而非从SUN到MON即可。
内容的提问来源于stack exchange,提问作者Johny
相关产品推荐
相关产品推荐

