IBM BPM 8.6新手求助:如何将GEX Toolkit从8.5.7升级至8.6.0
Hey there! Since you're new to IBM BPM and looking to upgrade your GEX Toolkit from 8.5.7 to 8.6.0, let's walk through the step-by-step process clearly:
Step 1: Pre-Upgrade Prep & Checks
- First, confirm your IBM BPM 8.6.0 environment (Process Center + Process Servers) is fully set up and running smoothly.
- Back up your existing 8.5.7 GEX Toolkit: Export it as a
.twxfile via the Process Center console—this ensures you can roll back if anything goes wrong. - Audit dependencies: Check if any process applications or other toolkits linked to the 8.5.7 GEX Toolkit need pre-updates to be compatible with 8.6.0.
Step 2: Get the Official GEX Toolkit 8.6.0
- You’ll need to obtain the 8.6.0-specific GEX Toolkit package through IBM’s official channels (like Passport Advantage or Fix Central, based on your licensing). Double-check that the version matches IBM BPM 8.6.0 exactly—mismatched versions will cause compatibility issues.
Step 3: Import the 8.6.0 Toolkit into Process Center
- Log into your IBM BPM 8.6 Process Center console.
- Navigate to the Toolkits section, then click Import > Toolkit from File.
- Select the downloaded 8.6.0 GEX Toolkit
.twxfile, follow the on-screen prompts, and assign it to the correct workspace/space if you’re using segmented spaces.
Step 4: Update Dependencies for Linked Process Apps
- For any process apps that relied on the 8.5.7 toolkit, you’ll need to rewire their dependencies:
- Open the process app in the IBM BPM 8.6 Process Designer.
- Go to the Dependencies tab.
- Remove the old 8.5.7 GEX Toolkit entry, then add the new 8.6.0 version.
- Save the app and run a dependency check (look for warnings/errors in the Process Designer’s problem view) to catch any broken mappings.
Step 5: Test Thoroughly
- Validate all components in your process app that use GEX Toolkit features—services, human tasks, integrations, data types, etc.
- Deploy a test version to a 8.6 Process Server and run end-to-end tests to confirm functionality matches expectations.
- If you hit errors, check the IBM BPM logs (
SystemOut.log,SystemErr.log) for details, and verify that toolkit artifacts are correctly mapped in the 8.6 version.
Step 6: Migrate to Production (When Ready)
- Once testing passes, export the updated process app from Process Center.
- Import and deploy it to your production 8.6 Process Server.
- Monitor the production environment closely post-deployment, and keep your 8.5.7 backup handy for a quick rollback if needed.
内容的提问来源于stack exchange,提问作者Lakshmi Narayana Galla
相关产品推荐
相关产品推荐

