如何构建带容量约束的VRP模型以实现月度计划与客户多次拜访?
针对Timefold VRP扩展场景的参考方案与代码调整建议
一、核心模型调整要点
- 拆分拜访任务:将原VRP中的
Customer实体拆分为Customer(存储客户基础信息、拜访次数需求、单拜访销售额)和Visit(规划实体,每个实例代表一次具体拜访)。每个Visit关联对应客户,并标记可安排的日期范围(1个月窗口),示例代码:@PlanningEntity public class Visit { @PlanningId private Long id; private Customer customer; private LocalDate earliestDate; private LocalDate latestDate; @PlanningVariable(valueRangeProviderRefs = {"vehicleRange"}) private Vehicle vehicle; @PlanningVariable(valueRangeProviderRefs = {"dateRange"}) private LocalDate plannedDate; // 若需自动分配日期则设为规划变量 private int expectedSales; // getter/setter } - 每日容量重置约束:通过约束流按车辆+日期分组,检查当日总负载不超过车辆容量:
@Constraint public Constraint dailyVehicleCapacity(ConstraintFactory factory) { return factory.forEach(Visit.class) .filter(visit -> visit.getVehicle() != null) .groupBy(Visit::getVehicle, Visit::getPlannedDate, Collectors.summingInt(Visit::getLoad)) .filter((vehicle, date, totalLoad) -> totalLoad > vehicle.getCapacity()) .penalize("Daily Vehicle Capacity Exceeded", HardSoftScore.ONE_HARD, (vehicle, date, totalLoad) -> totalLoad - vehicle.getCapacity()); }
二、均匀分布与销售额最大化的约束实现
- 销售额最大化:将单拜访销售额作为软约束奖励,优先安排高价值拜访:
@Constraint public Constraint maximizeTotalSales(ConstraintFactory factory) { return factory.forEach(Visit.class) .filter(visit -> visit.getVehicle() != null) .reward("Maximize Sales", HardSoftScore.ONE_SOFT, Visit::getExpectedSales); } - 拜访均匀分布:针对每个客户,计算已安排拜访的日期间隔方差,惩罚间隔差异过大的情况:
@Constraint public Constraint evenlyDistributeCustomerVisits(ConstraintFactory factory) { return factory.forEach(Customer.class) .join(Visit.class, Joiners.equal(Customer::getId, Visit::getCustomerId)) .groupBy((customer, visit) -> customer, Collectors.mapping(Visit::getPlannedDate, Collectors.toList())) .filter((customer, dateList) -> dateList.size() == customer.getRequiredVisitCount()) .penalize("Uneven Visit Distribution", HardSoftScore.ONE_SOFT, (customer, dateList) -> calculateDateIntervalVariance(dateList)); } private int calculateDateIntervalVariance(List<LocalDate> dateList) { Collections.sort(dateList); List<Integer> intervals = new ArrayList<>(); for (int i = 1; i < dateList.size(); i++) { intervals.add((int) ChronoUnit.DAYS.between(dateList.get(i-1), dateList.get(i))); } double mean = intervals.stream().mapToInt(Integer::intValue).average().orElse(0); return (int) intervals.stream().mapToDouble(d -> Math.pow(d - mean, 2)).sum(); }
三、参考模型与入门项目迁移方向
无需寻找完全匹配的现成项目,可基于Timefold官方示例组合改造:
- 多次拜访逻辑:参考
Employee Rostering示例中员工重复排班的思路,将“重复班次”替换为“客户重复拜访”,通过批量生成Visit实例满足客户的拜访次数需求。 - 日期分组约束:参考
Maintenance Scheduling示例中按日期分组的资源负载检查逻辑,迁移到车辆每日容量重置的约束实现上。 - 基础框架复用:直接复用官方VRP示例中的
Vehicle、Location、路径距离计算等模块,减少重复开发。
四、关键优化注意事项
- 规划变量配置:若需自动分配拜访日期,将
Visit的plannedDate设为规划变量,值范围设为1个月内的工作日集合。 - 得分权重调整:根据业务优先级设置权重,比如将每日容量约束设为硬约束,销售额奖励权重高于均匀分布惩罚权重。
- 求解器性能优化:针对1个月窗口的大规模问题,调整求解器终止条件(如设置
termination.spentLimit=PT30M),或启用constructionHeuristic快速生成初始解。